Construction sites and operations shall be required to maintain during and after all construction, development, excavation and/or alteration operations, structural and non-structural best management practices with the intent to reduce pollutants and sediment in stormwater runoff.
(A) Construction and operations site plans and permits shall be required and reviewed by the city prior to the initiation of construction operations. Site plans shall include descriptions of structures, procedures, and or control measures designed to reduce and control sediment and pollutant loading either directly or indirectly to stormwater runoff.
(B) Construction or construction operations over any existing or planned stormwater management system or any such operations causing interference with any stormwater management system shall not be permitted.
(C) A schedule of inspections for monitoring shall be developed to be carried out during and after the construction and operation phases as conditions to the permit to determine and verify compliance with this section.
(Ord. O-93-52, passed 10-20-93)