§ 51.094 ON-SITE WATER IMPROVEMENTS.
   (A)   In the case of a system to serve a subdivision, the developer must first submit to the City Engineer for his approval a preliminary subdivision plat showing all details of the topography thereon.
   (B)   In the case of a system to serve an existing lot or parcel for which a subdivision plat is not required, the developer must submit a preliminary site plan showing the improvements proposed and all details of the topography thereon.
   (C)   Upon receipt of said preliminary subdivision plat or site plan, the Engineer will, after reasonable time for study thereof, advise the developer as to the availability of a water feeder main.
   (D)   If it is determined that no additional off-site improvements are required, the applicant shall submit a written application to the city requesting that the city proceed with the design of on-site water improvements.
   (E)   The applicant shall consent to the total cost of the design and inspection of said improvement, which consent shall be evidenced by the applicant's depositing with the Finance Director of the city a sum equivalent to 15% of the total approximate cost of construction of the aforesaid water improvements. Said 15% is to cover the cost of preparing plans, specifications, cost estimates and inspection during and after construction.
   (F)   The applicant shall provide, at no cost to the city, any easements that the city shall deem necessary to furnish the service requested by applicant.
   (G)   The applicant shall then have the responsibility of constructing the aforementioned water facilities consistent with the plans and specifications prepared by the city. The city will provide engineering inspection of the improvement and will not refund any of the 15% deposit not used for design or inspection.
   (H)   Upon completion of the project, the applicant shall convey to the city the water improvements and any appurtenances thereto by an appropriate instrument recordable in the public records of Broward County. The city shall have the responsibility of maintaining every facility constructed and installed under these provisions.
('72 Code, § 36-78) (Ord. O-72-206, passed 12-6-72)