A site plan required hereunder shall specify or contain the following:
(A) The location and size of interior and exterior area(s) and structure(s) to be used for on-site storage, use, load/unloading, recycling, or disposal of hazardous materials.
(B) The location of all underground and aboveground storage tanks for such uses as fuel storage, waste oil holding tanks, hazardous materials storage, collection of contaminated stormwater or wash water, and all similar uses.
(C) The location of existing and proposed wells.
(D) The location of exterior drains, dry wells, catch basins, retention/detention areas, sumps, and other facilities designed to collect, store or transport stormwater or wastewater. The point of discharge for all drains and pipes shall be specified on the site plan.
(E) Areas on the site that the applicant has reason to believe are contaminated, together with a report on the status of site cleanup, if applicable.
(F) Submission of "Hazardous Materials Reporting Form for Site Plan Review".
(G) Submission of "Village of Holly Environmental Permits Checklist".
(Ord. 446, passed 10-11-2016)