§ 3-106  INSTALLATION PROCEDURE.
   (A)   An excavation permit must be obtained from the city for the purpose of installing pipe, or making repairs, the paving, stones and earth must be removed and deposited in a manner that will occasion the least inconvenience to the public and provide for adequate drainage.
   (B)   No person shall leave an excavation made in the street, alley or sidewalk open at any time without a barricade and, during the night, warning lights. After service pipes are laid, the streets, alleys and sidewalks shall be restored to good condition. If the excavation in any street, alley or sidewalk is left open or unfinished for a period of 24 hours or more, the Street Department shall have the duty to finish or correct the work and all expenses so incurred shall be charged to the consumer. All installations or repairs of pipes require inspections as are required by the Plumbing Code adopted in Ch. 9 of this code of ordinances. It is the customer’s responsibility to notify the Plumbing Inspector at the time the work is ready for each inspection.
   (C)   All installation shall be done under the supervision and strictly in accordance with the rules, regulations and specifications prescribed for such installation by the Plumbing Code; provided that, the said rules, regulations and specifications have been reviewed and approved by the governing body.
(2005 Code, § 3-106)
Statutory reference:
   Related provisions, see Neb. RS 16-681