The licensee shall obtain a permit from the proper city authority before commencing construction or alteration of the system, including the opening or disturbance of any street, sidewalk, driveway or public place. Any and all streets which are disturbed or damaged during the construction, alteration, operation, maintenance or reconstruction of the system shall be promptly repaired by the licensee, at its expense, and to a similar condition prior to the disturbance or damage.
(2005 Code, § 13-201)