§ 152.46 CRITICAL FACILITIES.
   Construction of new critical facilities shall be, to the extent possible, located outside the limits of the SFHA (100-year floodplain). Construction of new critical, facilities shall not be permissible within the floodway; however, they may be permissible within the SFHA if no feasible alternative site is available. Critical facilities constructed within the SFHA shall have the lowest floor elevated on foot or more above the level of the base flood elevation at the site. ...ILLEGIBLE TEXT... displaced by or released into flood waters. Access routes elevated to or above the level of the base flood elevation shall be provided to all critical facilities to the extent possible.
(Ord. 2008-7, passed 11-10-2008)