§ 52.092 PRETREATMENT.
   (A)   All significant industrial users shall provide necessary waste water treatment as required to comply with this chapter and achieve compliance with any applicable federal categorical pretreatment standards within the time limitations as specified by the federal pretreatment regulations.
   (B)   The city may require the development of a compliance schedule for installation of pretreatment technology and/or equipment by any industrial user that cannot meet discharge limits required by this chapter.
   (C)   Any facilities required to pretreat waste water to a level required by this chapter shall be provided, operated and maintained at the user’s expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the city for review, and shall be acceptable to the city before construction of the facility.
   (D)   The review of such plans and operating procedures will in no way relieve the user from the responsibility of modifying the facility as necessary to produce an effluent that complies with the provisions of this chapter.
   (E)   Any subsequent changes in the pretreatment facilities or method of operation shall be reported to and be acceptable to the city prior to the user’s initiation of the changes.
(Ord. 2014-01, passed 6-9-2014)