§ 91.18 PERMIT LIMITATIONS.
   (A)   Limitation on area. A right-of-way permit is valid only for the area of the right-of-way specified in the permit. No permittee may do any work outside the area specified in the permit, except as provided herein. Any permittee which determines that an area greater than that specified in the permit must be obstructed or excavated must before working in that greater area:
      (1)   Make application for a permit extension and pay any additional fees required thereby; and
      (2)   Be granted a new permit or permit extension.
   (B)   Obstruction from small wireless facility work. The city will not require an additional small wireless facility permit fee or require a new collocation agreement for routine maintenance of a small wireless facility, for replacement of a small wireless facility with a new facility that is substantially similar or smaller in size, weight, height, and wind or structural loading than the small wireless facility being replaced; or for installation, placement, maintenance, operation, or replacement of micro wireless facilities that are suspended on cables strung between existing utility poles in compliance with national safety codes. The city may require advance notification, however, of these activities if the work will obstruct the public right-of-way.
   (C)   Limitation on dates. A right-of-way permit is valid only for the dates specified in the permit. For a small wireless facility permit, the term of the permit is equal to the length of time that the small wireless facility is in use, unless the permit is revoked under this section. No permittee may begin its work before the permit start date or, except as provided herein, continue working after the end date. If a permittee does not finish the work by the permit end date, it must apply for a new permit for the additional time it needs, and receive the new permit or an extension of the old permit before working after the end date of the previous permit. This supplementary application must be submitted before the permit end date.
(Ord. 02-2018, passed 4-10-2018)