TABLE X: HIGHWAY IMPROVEMENTS
Ord./Res. No.
Date
Description
Ord./Res. No.
Date
Description
1985-29
8-5-1985
State Route 138 (Danville Road), beginning at the city’s most westerly corporation line on Danville Road to the junction of Oak Street.
1986-6
4-7-1986
State Route 73 (North West Street/Collins Avenue) beginning at the north west corporation limits of the city to the junction of U.S. Route 62.
1986-7
4-7-1986
State Route 124 (Main Street) beginning at the junction of U.S. Route 50 East to the most easterly corporation limit of the city.
Res. 86-25
11-3-1986
State Route 124 from the intersection of U.S. Route 50 East to 0.69 mile west of County Road 27, total length of work being approximately 0.50 mile.
1987-19
7-6-1987
U.S. Route 62 (High Street) at the intersection with State Route 73 West to the north corporation line, a distance of 2.19 miles more or less.
Res. 87-22
10-5-1987
State Route 73, beginning at the north west corporation limit to junction of U.S. Route 62, total length of work being approximately 0.89 miles.
Res. 87-24
10-5-1987
The upgrading of the traffic signal on U.S. Route 62, at the intersection of North High Street (Harry Sauner Road) and Highland Plaza Center in the city, total length of work being approximately 0.175 miles.
1988-6
3-7-1988
Replacing existing structure No. 3601234 over Moberly Branch on U.S. Route No. 62 (High Street), which is narrow and deficient, with a new structure and all necessary approach work.
1988-14
6-6-1988
U.S. Route 62 (High Street) at the south corporation line of the city to the north corporation line, a distance of 3.29 miles.
1988-23
9-12-1988
Upgrading the existing guardrail by replacing Type 5 guardrail within the city limits on West Street (State Route 73) for approximately 0.06 of a mile, more or less.
Res. 88-28
11-7-1988
The upgrading of the existing guardrail on State Route 73 (West Street), for approximately 0.06 of a mile, lying within the city.
Res. 90-19
5-7-1990
State Route 124 (Willettsville Pike) beginning at the city’s northwest corporation line, east to the junction of U.S. Route 50.
Res. 90-30
6-4-1990
U.S. Route 62 (High Street) beginning at the city’s south corporation line, to the north corporation line within the city.
Res. 92-19
11-2-1992
Replace Moberley’s Bridge on N. High Street (U.S. Route 62, north).
1992-25
12-7-1992
Main Street (U.S. Route 50).
1994-12
5-2-1994
Replace and upgrade traffic lights on U.S. Routes 62 and 50 and State Route 73.
Res. 96-7
2-5-1996
Replacement and upgrade of traffic signals in the city.
1996-12
8-9-1996
Resurfacing State Route No. 124 East in the city by ODOT.
1997-7
2-3-1997
Repaving State Route No. 138 within the city.
1999-3
2-1-1999
Maintaining and preserving pavement on a section of State Route No. 138.
1999-4
2-1-1999
Maintaining and preserving pavement on a section of State Route No. 50.
1999-5
2-1-1999
Maintaining and preserving pavement on a section of State Route No. 62.
2000-16
11-6-2000
Improving a portion of State Route 138 on Danville Pike and South Streets.
Res. 01-7
2-5-2001
Improving a portion of State Route 138 on Danville Pike and South Streets.
Res. 06-39
7-10-2006
Improving State Route 124 for the length approximately 0.03 miles.
Res. 09-10
2-9-2009
Resurfacing portions of State Routes 73, 124, and 138.
Res. 09-25
4-13-2009
Urban paving of 1.16 miles of State Route 73, 0.47 miles of State Route 138, and 0.19 miles of State Route 247.
Res. 10-7
3-8-2010
Giving consent to resurface portions of State Route No. 73, State Route No. 247, and State Route No. 785. The State Route No. 73 portion is within the corporation limits of the city, beginning at its intersection with State Route No. 247 and terminating at the corporation limit.
Res. 10-11
4-12-2010
Approving two-lane resurfacing of 0.66 miles of State Route No. 73. 6.34 miles of State Route No. 247, and 3.60 miles of State Route No. 785, lying within the city.
Res. 10-17
5-10-2010
Authorizing the Mayor to prepare and submit an application for FY 2010 CDBG Formula Funds for roadway improvements to Beech Street from East Street to Bell Street.
Res. 13-12
5-13-2013
Giving consent to resurface the highway with asphalt concrete on State Route No. 124, beginning at the Clinton County line and terminating at Hillsboro, with a small portion within the city corporate limits.
Res. 17-39
- -2017
Resurfacing project; State Route No. 124 from city limits to State Route No. 506 lying within the city.
Res. 17-24
7-10-2017
Resurfacing project; State Route No. 138 lying within the city.
Res. 18-36
9-10-2018
Resurfacing project; U.S. 50 from S.L.M. 12.69 through 14.61 and 14.65 lying within the city.
Res. 18-44
10-22-2018
Resurfacing project; a portion of State Route No. 138 lying within the city.
Res. 21-43
8-9-2021
Resurfacing project; a portion of State Route No. 73 lying within the city.
Res. 2020-14
10-12-2021
Resurfacing project; West South Street (S.R. 138) between South Elm Street and South High Street, including pavement markings, lying within the city.
Res. 22-22
5-19-2022
Approving Ohio Department of Transportation paving project PID 109825.