§ 51.04  BUILDING SEWERS AND CONNECTIONS.
   (A)   No unauthorized person shall uncover, make any connections with, or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the village.
   (B)   All disposal by any person into the sewer system is unlawful except those discharges in compliance with federal standards promulgated pursuant to the Federal Act and more stringent state and local standards.
   (C)   When sewer service is desired, the owner or the owner’s agent shall make application on a special form furnished by the village. (Reference Appendix A below.) The permit application shall be supplemented by any specifications, plans, or other information considered pertinent in the judgement of the village. A permit and inspection fee, in an amount as set by the Board, for a building sewer permit shall be paid to the village at the time the application is filed.
   (D)   A building sewer permit will only be issued and a sewer connection shall only be allowed if it can be demonstrated that the downstream sewerage facilities, including sewers, pump stations, and wastewater treatment facilities, have sufficient reserve capacity to adequately and efficiently handle the additional anticipated waste load.
   (E)   All costs and expenses incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the village from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
   (F)   A separate and independent building sewer shall be provided for every building, except that where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court, yard, or driveway, the building sewer from the front of the building may be extended to the rear building and the whole considered as one building sewer.
   (G)   Old building sewers may be used in connection with new buildings only when they are found to be sound and serviceable, on examination and test by the village.
   (H)   The size, slope, alignment, materials of construction of building sewer, and the methods to be used in excavation, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the village. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM International (formerly known as the American Society for Testing Materials), the latest edition of the Water Environmental Foundation’s publication Activated Sludge (Manual of Practice No. 9) and the latest edition of the Illinois Society of Professional Engineers’ publication Standard Specifications for Water and Sewer Main Construction in Illinois shall apply.
   (I)   Whenever possible, the building sewer shall be brought to the building at an elevation below the basement floor. In all buildings in which any building drain is too low to permit gravity flow to the public sewer, sanitary sewage carried by such building drain shall be lifted by a means which is approved in accordance with division (C) above, and discharged to the building sewer.
   (J)   No person(s) shall make connection of roof downspouts, exterior foundation drains, area drains, or other sources of surface runoff or groundwater to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer.
   (K)   The connection of the building sewer into the public sewer shall conform to the requirements of the Building and Plumbing Code, or other applicable rules and regulations of the village, or the procedures set forth in appropriate specifications of the American Society of Testing Materials, Water Pollution Control Federation Manual of Practice No. 9, and Standard Specifications for Water and Sewer Main Construction in Illinois. All such connections shall be made gas-tight and water-tight. Any deviation from the prescribed procedures and materials must be approved by the village before installation.
   (L)   The applicant for the building sewer permit shall notify the village when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the village or its representative.
   (M)   All excavation for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways, and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the village.
(Ord. 153, passed 7-9-1990)