§ 152.061 POLICY ON STORMWATER POLLUTION PREVENTION.
   (A)   Effective stormwater pollution prevention on construction sites is dependent on a combination of preventing movement of soil from its original position (erosion control), intercepting displaced soil prior to entering a waterbody (sediment control), and proper on-site materials handling. The developer shall submit to the county, a SWPPP with detailed erosion and sediment control plans as well as a narrative describing materials handling and storage, and construction sequencing. This SWPPP shall be site and project specific. The SWPPP and the project management log shall be retained for at least three years from the date the project permit is terminated.
   (B)   Detailed requirements for stormwater pollution prevention on construction sites within the county, which are consistent with IDEM minimum requirements and apply to all land-disturbing activities, are contained in the Hendricks County Stormwater Technical Standards Manual.
(Ord. 2023-45, passed 12-12-2023)