§ 152.046 INSPECTION, MAINTENANCE, RECORD KEEPING, REPORTING.
   (A)   After the stormwater management approval is granted (by the county) and the commencement of construction activities, the county has the authority to conduct inspections of the work being done to ensure full compliance with the provisions of this chapter, the Stormwater Technical Standards Manual, and the terms and conditions of the approval.
   (B)   The county also has the authority to perform long-term, post-construction inspection of all public or privately owned stormwater quantity facilities. The inspection will cover physical conditions, available storage capacity, and the operational condition of key facility elements. Stormwater quantity facilities shall be maintained in good condition, in accordance with the terms and conditions of the stormwater management approval, and shall not be subsequently altered, revised or replaced except in accordance with the stormwater approval, or in accordance with approved amendments or revisions to the original stormwater management approval. If deficiencies are found during the inspection, the owner of the facility will be notified by the county and will be required to take all necessary measures to correct such deficiencies. If the owner fails to correct the deficiencies within the allowed time period, as specified in the county notification, the county will undertake the work and collect from the owner using lien rights if necessary.
   (C)   Assignment of responsibility for maintaining facilities, including the retention/detention ponds, serving more than one lot or parcel shall be documented by appropriate covenants to property deeds, unless responsibility is formally accepted by a public body, and determined before the final stormwater approval. Stormwater detention/retention basins may be donated to the county or another unit of government designated by the County Drainage Board for ownership and permanent maintenance, providing the County Drainage Board or other governmental unit is willing to accept responsibility.
(Ord. 2023-45, passed 12-12-2023)