The minimum permit bond required is based on the type and amount of work being authorized by this permit. Bond coverage is based upon the controlling operation of the proposed work within the right-of-way. Bond coverages may be adjusted at the discretion of the County Engineer and/or the Board of Commissioners.
TYPE OF WORK | MINIMUM BOND REQUIRED |
TYPE OF WORK | MINIMUM BOND REQUIRED |
Open road cut | $15,000 per location |
Underground linear project including grading, trenching, or excavation parallel to road | $10,000 per mile or fraction of a mile |
Push or bore under road | $5,000 per push or bore |
Placement/removal of poles/overhead lines | $5,000 per mile or fraction of a mile |
Tap pit/spot cut dirt | $5,000 per tap pit/spot cut |
Major commercial drive | $15,000 per drive |
Minor commercial drive | $10,000 per drive |
Construction/temporary drive | $10,000 per drive |
Public road approach/private road approach | $15,000 per approach |
Utility pull-off drive | $10,000 per drive |
Residential drive or field entrance | No bond required |
Maintenance bonds | Equal to initial permit bond amount |
(Ord. 2023-11, passed 3-14-2023)