§ 37.26 EROSION CONTROL UNIFORM SCHEDULE.
   (A)   Erosion control uniform schedule of fees.
Type of Fee
Fees
Type of Fee
Fees
Amenity Area
Amendment to a development plan
$500, plus $10 per lot/acre/unit
Secondary development plan
$500, plus $10 per lot per acre/unit
Development Plan Review
Amendment to a development plan
$500, plus $10 per lot/acre/unit
Secondary development plan
$500, plus $10 per lot/acre/unit
Miscellaneous Fees
Blackline copies
$2 per sheet
Copies
$1 per sheet
Returned check fee
$25
Planned Unit Development
Amendment to an approved PUD
$500, plus $10 per lot/acre/unit
Secondary development plan
$500, plus $10 per lot/acre/unit
Ponds*
5,000 to 20,000 sq. ft. surface area disturbed
$100
20,001 to 43,559 sq. ft. surface area disturbed
$200
43,560 sq. ft. or more surface area disturbed
$300
Residential; Principal
Accessory structures
$100
Additions
$100
Demolition
$250
Detached garage
$100
Expedited review
$75
Multi-family dwelling
$500 per building
Relocation
$100
Single-family dwelling
$250
Swimming pools
$100
Shopping Center
Amendment to approved secondary development plan
$1,000, plus $10 per lot/acre/unit
Secondary development plan
$1,000, plus $10 per lot/acre/unit
Stop Work Orders
Fine for continued construction after stop work order
$1,000 first day, up to $500 for each additional day
Permit reinstatement
Minimum $500, or two times the filing fee, whichever is greater
Subdivision
Amendment to a major subdivision
$500, plus $10 per lot/acre/unit
Major subdivision; secondary
$500, plus $10 per lot/acre/unit
Minor subdivision; secondary
$250
Utility
5,000 to 20,000 sq. ft. surface area disturbed
$150
20,001 to 43,559 sq. ft. surface area disturbed
$250
43,560 sq. ft. or more surface area disturbed
$500
Notes to Table
*   Except those ponds/detention areas already reviewed, and approved, in the development process.
 
   (B)   Engineering review fees. All engineering projects that require a stormwater pollution prevention plan for construction sites will require a review fee above and beyond the clean water permit fee. The review fee shall equate to the contract rate of the reviewing engineer, not to exceed $110 per hour. This fee shall be paid to the County Drainage Board, and shall be paid in full before any clean water permit is issue.
   (C)   Fees. All fees are non-refundable, unless so permitted by the Drainage Board.
(Ord. 2013-09, passed 4-9-2013)