The construction and connection of the building sewer to the public sewer shall conform to the requirements of the state’s Building and Plumbing Code, applicable rules and regulations of the city, and the materials and procedural specifications set forth in the American Society of Testing Materials (ASTM) and the Water Pollution Control Federation (WPCF) Manual of Practice No. 9. All such connections shall be made gas and water tight and verified by proper testing to prevent I/I.
(Prior Code, § 53.37) (Ord. 181, passed 8-10-1993)