Where required by the representative, industrial users shall install and maintain at their own expense a suitable structure or control manhole with such necessary meters and other testing equipment needed to facilitate observation, sampling, and measurement of wastewater. The manhole will be safe and accessible at all times. The Council may require submission of laboratory analyses to illustrate compliance with this chapter and any special conditions for discharge established by the Council or responsible regulatory agency. All measurements, tests, and analyses to which reference is made in this chapter shall be determined in accordance with the latest edition of Standard Methods of the Examination of Water and Wastewater, published by the American Public Health Association and kept for a period of one year.
(Prior Code, § 53.61) (Ord. 181, passed 8-10-1993)