§ 156.04 BUILDING PERMITS; STRUCTURES MOVED WITHIN THE CITY.
   (A)   (1)   Where a structure is to be moved to a location within the city, the Building Inspector shall collect, in addition to the fees set forth above, $150 if the structure which is to be moved is located within ten miles of the corporate limits of the City of Heath, the fee shall be $150, plus $.25 per mile for the distance which exceeds ten miles from the corporate limits of the city.
      (2)   To move a building from one place in the city to another place in the city, the additional inspection fee shall be $50 in the event the fee provided for herein has been paid and inspection reveals that the building does not comply with the requirements of the city and may not be brought into or through the city, no refund shall be made of the above inspection fee and the entire amount shall be retained by the city to cover the cost of the inspection; however, in such situation, the fee provided for in § 156.03 above shall not be collected and, if the same has been previously collected, it shall be refunded to the applicant.
   (B)   (1)   Before any building permit may be issued as set out herein, the owner of the building and/or the owner of the land upon which the building is to be finally situated shall be present to the Building Inspector complete plans of the improvements to be made upon the building prior to its occupancy or use.
      (2)   The plans shall provide for improvement of the structure, if necessary, to bring it within the standards of all building codes and other codes and chapters of the city, and of the requirements of this chapter.
      (3)   The improvements provided for in the plans, if approved, and a building permit issued, shall be completed by the owner and/or builder or contractor improving the structure or building within 120 days of the day of issuance of the building permit.
      (4)   It shall be unlawful for any owner, contractor or builder making improvements to a building or structure described herein in accordance with the plans presented for building permit to fail to complete the improvements within 120 days, and each and every day the improvements are not completed in accordance with the plans and in accordance with all building codes and other chapters of the city shall constitute a separate offense, and be subject to the fines provided for herein.
(2005 Code, § 9-7-4) Penalty, see § 10.99