§ 57.35 ELECTRICAL SUPPLY.
   (A)   Network provider shall be responsible for obtaining any required electrical power service to the micro network node, network node facilities, node support poles and ground equipment. The city shall not be liable to the network provider for any stoppages or shortages of electrical power furnished to the micro network node, network node facilities, node support poles or ground equipment, including without limitation, stoppages or shortages caused by any act, omission, or requirement of the public utility serving the structure or the act or omission of any other tenant or network provider of the structure, or for any other cause beyond the control of the city.
   (B)   Network provider shall not allow or install generators or back-up generators in the right-of-way in accordance with Tex. Local Gov't Code, § 284.002(12)(B)(1).
(Ord. 170822B, passed 8-22-2017)