§ 50.14 SERVICE PIPES; FLUSHING AND METER INSTALLATION; LAYING.
   (A)   Service pipes must be thoroughly flushed before meters are attached and space left and prepared in an approved location for the attachments of meter and connections.
(Prior Code, § 13.04.160)
   (B)   All service pipes must be laid at least four feet deep.
(Prior Code, § 13.04.170)
(Ord. 43, passed - -1913)