(A) Interconnection to the town’s electrical utility shall be granted only to new or existing customers in good standing under town’s electric service schedules.
(B) (1) For eligibility for interconnection to the town’s electrical utility, a generating facility shall have a rated output 100 kilowatts (kW-DC) or less.
(2) Eligibility of a generating facility with rated output of greater than 100 kW-DC shall be determined by the town on a case-by-case basis regarding voltage level of connection, metering and purchase of output. However, a similar facilities interconnection agreement will be required.
(Ord. 2019-1, passed 1-7-2019)