§ 52.074 PERMIT CONDITIONS.
   (A)   Discharge permits shall be expressly subject to all provisions of this chapter and to all other regulations, user charges and fees established by the Agency. The conditions of the permits shall be uniformly enforced by the Agency in accordance with this chapter and with applicable state and federal regulations.
   (B)   Permits may contain the following:
      (1)   The unit charge or schedule of user charges and fees for the wastewater to be discharged to a community system;
      (2)   The average and maximum wastewater constituents and characteristics;
      (3)   Limits on rate and time of discharge or requirements for flow regulation and equalization;
      (4)   Requirements for the installation of inspection and sampling facilities;
      (5)   Pretreatment requirements;
      (6)   Specifications for monitoring programs, which may include sampling locations, frequency and method of sampling and number, types and standards for tests and reporting schedules;
      (7)   Requirements for the submission of technical reports or discharge reports;
      (8)   Requirements for maintaining plant records related to discharge as specified by the Agency, and affording the Agency access thereto;
      (9)   Mean and maximum mass emission rates, or other appropriate limits when incompatible pollutants are proposed or are present in the discharge;
      (10)   Compliance schedules; and
      (11)   Other conditions as deemed appropriate by the Agency.
(Ord. 2004-16, passed 1-5-2005; Ord. 2020-02, passed 6-1-2020)