1103.04 DETAILED ENGINEERING/CONSTRUCTION DRAWINGS.
   (a)   After receiving notice of the approval of the preliminary Plat and prior to the filing of the final Plat, the subdivider shall present to the Planning Commission detailed engineering drawings of all utility, site, and street improvements to be constructed in the proposed subdivision as required by the City.
      (1)   The detailed engineering drawings shall be clearly and legibly drawn upon mylar at a scale of one (1) inch equals one hundred (100) feet. They shall be drawn on one or more sheets whose dimensions are twenty-four inches by thirty-six inches (24" x 36"). Two sets of drawings shall be submitted to the Planning Commission. The engineering drawings and plans shall show:
         A.   Title or cover sheet.
         B.   Plan, profiles, typical cross sections, specifications, notes and other details related to streets, right-of-ways, storm and sanitary sewers, water mains, fire hydrants, guardrails and other proposed or required physical improvements in accordance with these Rules and Regulations (see Appendix D) and/or the Rules and Regulations of the office of the County Engineer governing the surface physical improvements for private developments within the unincorporated area of Hamilton County as amended.
         C.   Street details and rights-of-way and related improvements in accordance with the Rules and Regulations of the City Engineer (see Appendix D) and/or the Rules and Regulations of the Hamilton County Engineer’s Office.
         D.   Storm drainage facilities, as required by physical conditions of the site shall be shown on the plans in accordance with the requirements of the City Engineer, the Public Works Director (see Appendix D of these regulations), and/or the Rules and Regulations of the County Engineer of the Hamilton County Public Works Department.
         E.   Standard construction details and methods shall be in accordance with the provisions of these Rules and Regulations in Appendix D and/or the Rules and Regulations of the County Engineer's Office.
         F.   A plan, for review, of the location of any ornamental entranceway structure, and utility easements, if proposed for the Subdivision.
         G.   A plan for review by the City Engineer of the location of all utility easements included in the subdivision.
   (b)   The City Engineer shall within five (5) days after the filing of the above typical sections and complete profiles transmit copies of same to the municipality officials, and when required, to the County Board of Health for study and final recommendations. The City Engineer, after receiving a report from the aforementioned officials shall within fifteen (15) working days of submittal of the initial engineering plans notify in writing the subdivider of any recommended changes or suggestions so that the subdivider may prepare the final improvement plans and Plat of subdivision.