§ 153.229 CONSTRUCTION PLAN/DRAWING.
   (A)   In addition to the construction plan requirements for water and sewer, stormwater management plans showing grading and drainage shall be submitted. One complete set of development plans signed and sealed by a professional state land surveyor or engineer or state registered landscape architect shall be submitted.
   (B)   The following information shall be provided on the site specific stormwater management plans:
      (1)   Erosion control measures and details;
      (2)   Detailed topographic information. A minimum of two-foot contours is required. Vertical datum shall be provided;
      (3)   Storm sewer profiles or design tables indicating the top of structure, invert elevations, and pipe slope;
      (4)   The 100-year floodplain boundaries and elevations from the most recent FIRM;
      (5)   All jurisdictional wetland boundaries on-site;
      (6)   All proposed stormwater management facilities;
      (7)   All existing stormwater management facilities should be shown. Existing structures shall be labeled with invert, size, and material;
      (8)   Construction detail for improvements; and
      (9)   Drainage easements.
   (C)   (1)   With the construction drawings, a revised stormwater management statement shall be submitted, if required.
      (2)   A copy of submittal for stormwater permit and the submittal for erosion control plan, if required, shall be submitted.
(Ord. passed 10-17-2011)