8-2-12: PROPER DESIGN AND CONSTRUCTION OF NEW SEWERS AND CONNECTIONS 1 :
The size, slope, alignment, materials of construction, and the methods to be used in excavating, placing of pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Codes or other applicable rules and regulations of the City and State. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply. (Ord. 79-1, 10-2-1979; amd. 1984 Code)

 

Notes

1
1. Section 8-2-7 of this chapter contains additional requirements covering the proper design and construction of the City's sanitary sewers, building sewers and connections.