4-11-8-1: CERTIFICATION:
If the following floodproofing requirements are to be applied to a proposed structure, as stipulated by the Floodplain Administrator in accordance with these regulations, the methods used must be certified as adequate by a registered professional engineer or architect. (Ord. 95-1, 2-7-95)