(A) Description. The work of this subchapter includes the supply of all materials, labor, and equipment required for the installation and testing of sanitary sewer force mains. Force main piping inside of structures such as lift stations and valve pits is specified in this chapter.
(B) Quality assurance. All materials shall be new and unused, supplied by a single manufacturer where possible. All pipe and fittings shall be of similar materials as allowed by these specifications.
(Ord. passed - -)