§ 152.01 SCOPE.
   This subchapter covers the work necessary for the trench excavation and backfill, complete, including but not limited to: clearing the right-of-way; protection of private property during construction; disposal of cleared materials; excavation of trench for the pipe and appurtenances; foundation stabilization; backfilling the pipe zone; removal, replacement, and rehabilitation of all fences, drainage ditches, waterways, culverts, concrete curbs, and sidewalks, or other features moved or damaged during construction; removal of all obstructions; removal of all existing pavement; locating and protecting existing utilities; repair of damaged utilities; the maintenance of access to public thoroughfares and to private property; the maintenance of adequate barricades, lights, and warning signs for the protection of the public; the public highways, county roads, streets and private drives; shoring, cribbing, bracing, sheeting, and dewatering as may be required; hauling and disposal of waste excavation, including temporary hauling and disposal of soil which cannot be accommodated within the designated right-of- way; repair of public and private property damaged during construction; final cleanup of the construction area; restoration of the landscape in public rights-of-way including replacement lawns, grasses, trees, shrubs, and mulches; and all miscellaneous items of work required to complete the construction specified hereunder.
(Ord. passed - -)