§ 50.02  ELECTRICAL SERVICE RATES AND CHARGES.
   (A)   The rates and charges for electrical service shall be as determined from time to time by the Village Board of Trustees.
      (1)   All kilowatt hours at 7.5¢ per KWHR.
      (2)   Industrial power: there shall be a negotiated rate with each industry.
   (B)   All rates and charges shall be subject to a fuel cost adjustment as set forth in the Alliant Energy Rate Schedule, Sheet No. 2 designated as Fuel Cost Adjustment Rider LW. The fuel cost adjustment shall be added to or deducted from the monthly bills pursuant to the formula set forth therein.
(1986 Code, § 7-3-2)  (Ord. passed 11-11-1975)