(A) The rates and charges for electrical service shall be as determined from time to time by the Village Board of Trustees.
(1) All kilowatt hours at 7.5¢ per KWHR.
(2) Industrial power: there shall be a negotiated rate with each industry.
(B) All rates and charges shall be subject to a fuel cost adjustment as set forth in the Alliant Energy Rate Schedule, Sheet No. 2 designated as Fuel Cost Adjustment Rider LW. The fuel cost adjustment shall be added to or deducted from the monthly bills pursuant to the formula set forth therein.
(1986 Code, § 7-3-2) (Ord. passed 11-11-1975)