A. All lots being filled shall be cleared of all debris, including brush and tree stumps, and shall be filled with a clean fill and/or topsoil to allow complete surface draining of the lot into local storm sewer systems or natural drainage rights-of-way. No construction shall be permitted which creates or aggravates water stagnation or a drainage problem on adjacent properties.
B. No trees, brush or debris shall be used as landfill or in lieu thereof, nor shall any landfilling operation be performed in such a manner as to cover unremoved trees and debris on any streets, lots or otherwise.
Next Doc