(A) Availability. Available for any customer having a billing demand load of 25 kilowatts to 99 kilowatts, except as hereinafter provided. Applicant must be located adjacent to an electric transmission or distribution line of the Utility that is adequate and suitable for supplying the service required.
(B) Character of service. Alternating current having a frequency of 60 cycles and furnished in accordance with the provision set forth hereunder.
(C) Rate.
(1) From the November 1, 2022 billing date through the April 1, 2023 billing date, the following rates shall apply:
Maximum load charge (monthly) | $5.16 per kilowatt of billing maximum load in the month |
Minimum charge | The monthly maximum load charge shall in no case be less than $109.65 per month |
Energy charge (in addition to the maximum load charge) | |
Consumption per month | Per KWH |
For each KWH used | $0.067 |
(2) From the May 1, 2023 billing date through the October 1, 2023 billing date, the following rates shall apply:
Maximum load charge (monthly) | $5.68 per kilowatt of billing maximum load in the month |
Minimum charge | The monthly maximum load charge shall in no case be less than $120.60 per month |
Energy charge (in addition to the maximum load charge) | |
Consumption per month | Per KWH |
For each KWH used | $0.074 |
(3) From the November 1, 2023 billing date through the April 1, 2024 billing date, the following rates shall apply:
Maximum load charge (monthly) | $6.13 per kilowatt of billing maximum load in the month |
Minimum charge | The monthly maximum load charge shall in no case be less than $130.25 per month |
Energy charge (in addition to the maximum load charge) | |
Consumption per month | Per KWH |
For each KWH used | $0.080 |
(4) From the May 1, 2024 billing date and thereafter, the following rates shall apply:
Maximum load charge (monthly) | $6.62 per kilowatt of billing maximum load in the month |
Minimum charge | The monthly maximum load charge shall in no case be less than $140.65 per month |
Energy charge (in addition to the maximum load charge) | |
Consumption per month | Per KWH |
For each KWH used | $0.086 |
(D) Adjustments. Maximum load and energy measurements, and the charges derived therefrom, are subject to adjustment for:
(1) Metering at a secondary voltage. Service hereunder may be metered at a secondary voltage which is designated as a standard voltage of approximately 460 volts, or lower, in which event, before applying any other adjustments or computing the charges, the maximum load and energy measurements shall each be increased by 3% to convert to the equivalent of service metered at a primary voltage.
(2) Power factor. The monthly maximum load will be adjusted for monthly lagging power factor to convert to billing maximum load, in accordance with the following formula:
Billing maximum load = Maximum load x 85
Lagging Pf. (in %)
Lagging Pf. (in %)
(E) Minimum charge. The monthly maximum load charge shall in no case be less than than that amount specified above for each applicable time period.
(Ord. 3-1965, passed 12-6-1965; Am. Ord. 10-1979, passed 11-5-1979; Am. Ord. l-1981, passed 2-2-1981; Am. Ord. 2-1982, passed 2-15-1982; Am. Ord. 1-1983, passed 5-2-1983; Am. Ord. 1-1987, passed 3-16-1987; Am. Ord. 7-1992, passed 12-21-1992; Am. Ord. 6-2003, passed 12-15-2003; Am. Ord. 2-2005, passed 4-4-2005; Am. Ord. 2-2011, passed 4-18-2011; Am. Ord. 4-2022, passed 8-12-2022)