(A) Load centers shall be of the meter pole type with a minimum of 200-amp capacity. Three/zero copper wire in conduit or 3/0 copper entrance cable shall be used. No entrance cable shall be used in conduit.
(B) If two 100-amp breakers are used, number 2 strand copper wire may be used from the meter to each individual breaker.
(C) The combination meter and breaker box shall be furnished by the Electric Utility. The breakers shall be furnished by the Electric Utility and both the combination box and breakers shall be installed by the customers electrical contractor at the customers expense. The meter box and breaker box combination shall not be mounted on Electric Utility transformer poles.
(Ord. 7-1992, passed 12-21-1992) Penalty, see § 51.999