A. Conformance With City Standards:
1. All construction or reconstruction of public, private and water service lines shall be in accordance with the city standard drawings and standard specifications, and subject to inspection by the city.
2. Plan and profile drawings shall be prepared for all new water mains (whether public or private) and for all water main extensions, reconstructions, or renovations; and all such plan and profile drawings must be reviewed and approved by an engineer designated by the city and the state department of environmental quality before any construction work on said water lines is started.
B. Right Of Entry For Inspection: The public works superintendent and the city representative assigned to read the water meters shall have the right to enter upon any premises connected with the public water system at all reasonable hours to determine that there is compliance with the provisions of this chapter. If conflict is noted, the owner of said premises or his agent shall be directed to alter, repair, or reconstruct said water facilities to conform to the requirements of this chapter within fifteen (15) days. (Ord. 984, 7-5-1995; amd. 2010 Code)