(A) The fee for permits shall be based on the square footage of the sign as provided for in § 13.00 of the Fee Schedule found in Appendix 1 of this Code.
(B) If any work is started or proceeded without obtaining a permit, the above specified fee shall be doubled to obtain the required permit.
(Ord. 476, passed 11-12-96; Am. Ord. 98-023, passed 8-11-98)