§ 152.03 PLACEMENT AND UNDERPINNING REQUIREMENTS.
   (A)   Placements of manufactured home on manufactured home stand by jacks or supports shall be such as to insure the retention of the manufactured home in a fixed position.
   (B)   All manufactured homes must be leveled and its foundation must be single block up to 30 inches in height from the ground level and double blocked or better between 30 inches to 48 inches, and 48 inches as maximum, except for any gap, opening, or space between the frame and ground level which exceeds 48 inches must have a foundation designed by a certified engineer. The design must be signed and sealed by the engineer and be approved by the Building Official.
   (C)   A fire resistive skirting, or underpinning, shall be installed around the bottom of the perimeter of any manufactured home to the ground within 30 days from the placement of the manufactured home and which shall be finished with not less than two coats of paint or be constructed of such materials not requiring painting (galvanized metal not included).
(`88 Code, Ch. 3, § 6.03) (Ord. 260, passed 1-10-89; Ord. 344, passed 6-23-92; Am. Ord. O-2023-005, passed 2-28-23) Penalty, see § 10.99