6-4-7: ADDITIONAL SUBMITTAL REQUIREMENTS FOR MACROCELL TOWERS:
In addition to the other requirements of this chapter, the following shall also accompany applications for macrocell towers:
   A.   Noise Study: A noise study shall be conducted, if requested by the Town.
   B.   Site Plan: A scaled site plan clearly indicating the location, type, height and width of the proposed tower, on-site land uses and zoning, adjacent land uses and zoning, separation distances, adjacent roadways, photo simulations, a depiction of all proposed transmission equipment, proposed means of access, setbacks from property lines, elevation drawings or renderings of the proposed tower and any other structures, topography, parking, utility runs and other information deemed necessary to assess compliance with this chapter. (Ord. 2019-002, 5-7-2019)