§ 150.05 DISCONNECTION OF UTILITY SERVICES; INSPECTION.
   Prior to the issuance of a demolition permit, all utility services must be disconnected between the street curb and sidewalk. If the water and/or sanitary sewer services are disconnected and capped by any person other than by the borough, the work must be inspected and approved by the borough's appointed designee. Inspection by the borough shall require a 24-hour notice, and the inspection shall be conducted between 7:00 a.m. and 3:30 p.m., Monday through Friday.