(A) Work to be done by town. The construction of laterals for the connection of the sewer or water pipes on any lot with sewer or water pipes in any street and the necessary excavation thereof shall be done only by the town unless otherwise authorized by the town.
(B) Work to be done by property owner. The construction of on-site piping or specialty pump stations required by the town of domestic users, all piping from the building(s) thereto, and all piping to the service valve assembly, shall be the responsibility of the property owner. Pump stations and piping shall be in accordance with the town’s standard specifications for materials and equipment. Any electrical power costs shall be billed directly to and paid by the customer.
(Ord. passed 5-9-2000)