A. Residential Subdivisions. Infrastructure improvements, whether public or private, including but not limited to streets, curbs, manholes, catch basins, swales, storm and sanitary sewers, off-site or area drainage, street names signs, traffic regulatory signs, street lights, traffic signals, survey monumentation, and park and recreation facilities, shall be installed and accepted by the Board of Public Works and Safety prior to the recording of the Secondary Plat or issuance of Improvement Location Permits (Building Permits) for single-family or two-family residential subdivision. Erosion control measures need to be in place but need not be green and growing if installed outside the normal growing season. Erosion control shall be covered by a performance guarantee until such time that eighty-five percent (85%) of the lots have been built upon.
1. Withholding of Final Permits. No Building Permit shall be issued for the last ten percent (10%) of lots in a final recorded subdivision plat or section thereof if ten percent (10%) be less than two (2), for the last two (2) lots of a subdivision or section thereof, until all public improvements required by the City for the plat (with the exception of sidewalks) have been fully completed and accepted for maintenance guarantee by the appropriate jurisdiction.
B. Commercial or Industrial Subdivisions. For commercial or industrial subdivisions the developer shall have the option of posting performance guarantees with the Board of Public Works and Safety and recording of the Secondary Plat prior to the installation of the associated infrastructure improvements.
(Ord. 20-29, §2, 9-21-20; Ord. 21-44, §1, 10-4-21)