Sec. 7-13 Three (3) Inspections Required.
   After the issuance of any building permit hereunder, the Building Commissioner shall make, or shall cause to be made, such inspections of the work being done under such permit as are necessary to insure full compliance with the provisions of this Article and the terms of the permit. It shall be the responsibility of the person or persons obtaining a permit to notify the Building Commissioner that the building or structure for which the permit has been obtained is ready for inspection. The permit holder shall notify the Building Commissioner for a minimum of three (3) inspections:
   (a)   Footing;
   (b)   Rough-in; and
   (c)   Final. (Ord. No. 81-38, § 13, 12-22-81; 1983 Greenwood Municipal Code, § 4-28)