SEC. 9-8-7 MANDATORY STANDARDS FOR LAND-DISTURBING ACTIVITY.
   No land-disturbing activity subject to the control of this chapter shall be undertaken except in accordance with the following mandatory standards:
   (A)   Buffer zone.
      (1)   No land-disturbing activity during periods of construction or improvement to land shall be permitted in proximity to a lake or natural watercourse unless a buffer zone is provided along the margin of the watercourse of sufficient width to confine visible siltation within the 25% of the buffer zone nearest the land- disturbing activity, provided that this subsection shall not apply to a land-disturbing activity in connection with the construction of facilities to be located on, over or under a lake or natural watercourse.
      (2)   Unless otherwise provided, the width of a buffer zone is measured from the edge of the water to the nearest edge of the disturbed area, with the 25% of the strip nearer the land-disturbing activity containing natural or artificial means of confining visible siltation.
   (B)   Graded slopes and fills. The angle for graded slopes and fills shall be no greater than the angle which can be retained by vegetative cover or other adequate erosion control devices or structures. In any event, slopes left exposed will, within 21 calendar days of completion of any phase of grading, be planted or otherwise provided with ground cover, devices or structures sufficient to restrain erosion.
(Ord. No. 99-119, § 8, passed 9-9-1999; Ord. No. 11-018, § 1, passed 4-11-2011)
   (C)   Fill Material. Materials being used as fill shall be consistent with those described in 15A NCAC 13B.0562 unless the site is permitted by the Department's Division of Waste Management to operate as a landfill. Not all materials described in Section .0562 may be suitable to meet geotechnical considerations of the fill activity and should be evaluated accordingly.
   (D)   Ground cover. Whenever land-disturbing activity is undertaken on a tract in excess of 5,000 square feet, the person conducting the land-disturbing activity shall install such sedimentation and erosion control devices and practices as are sufficient to retain the sediment generated by the land- disturbing activity within the boundaries of the tract during construction upon and development of the tract, and shall plant or otherwise provide a permanent ground cover sufficient to restrain erosion after completion of construction or development. Except as provided in § 9-8-8(B)(5), provisions for a permanent ground cover sufficient to restrain erosion must be accomplished within 90 calendar days following completion of construction or development.
(Ord. No. 99-119, § 10, passed 9-9-1999; Ord. No. 00-155, §§ 3, 4, passed 12-14-2000; Ord. No. 06-50, § 2, passed 6-8-2006)
   (E)   Prior plan approval. No person shall initiate any land-disturbing activity on a tract if more than one acre is to be uncovered unless, 30 or more days prior to initiating the activity, an erosion and sedimentation control plan for such activity is filed with and approved by the city.
(Ord. No. 98-7, passed 1-8-1998; Ord. No. 23-040, § 1, passed 5-11-2023)