(A) Lots shall be laid out so as to provide positive drainage away from all buildings, and individual lot drainage shall be coordinated with the general stormwater drainage pattern for the area. Drainage shall be designed so as to avoid the accumulation of stormwater on any one or more lots from adjacent lots.
(B) It shall be the responsibility of the lot owner to maintain the lot grade as provided for in the approved construction plans as it applies to drainage.
(Ord. 2002-13, passed 9-3-2002)