(A) Furnish and install all equipment for the lift station or stations, including all structures, pumps, piping and controls as shown on the drawings in Appendix A of this chapter and as described herein. A minimum of two pumps shall be installed, with each capable of meeting the peak design flow as required to provide 100% standby.
(B) The contractor shall be required to supply the pumps and control panel from a single manufacturer.