(A) All precast structures to be used in a project shall be structurally sound and free of defects.
(B) Any spalled concrete or voids shall be properly patched or repaired using equivalent- strength grout and properly cured before placement.
(C) Structures showing excessive cracking or damage should be rejected and replaced at the discretion of the town and at the expense of the contractor.
(Ord. 2010-3, passed 10-6-2010)