(A) It is unlawful for any person to cut, dig or excavate in any part of any street or alley right-of-way within the city, except for the purpose of making installations therein under contract with the city, without first filing with the City Engineer and/or the Director of Public Projects or Street Superintendent a written application for a permit to make such a cut or excavation at least three days in advance of the time of beginning the work to be done under such permit, except, that when an emergency exists, the applicant may secure such permit in less than such three-day period by stating in his application the exact emergency. All permits shall be submitted to and be approved by the City Engineer and/or the Director of Public Projects or Street Superintendent prior to being filed with the Clerk-Treasurer. Such application shall particularly describe the exact location, kind, dimension by feet and inches, type of road surface to be cut or excavated, nature of the opening to be made and the exact purpose of the proposed work.
(B) All applicants must pay a $35 permit and inspection fee at the time the permit is filed. The permit shall be valid for 90 days after approval is given by the City Engineer and/or the Director of Public Projects or Street Superintendent.
(C) Any and all work performed within the street or alley right- of-way in connection with such excavations, such as forcing pipe under pavement, trenches between the curb and sidewalks or trenches outside the paved macadam, oiled or stone surfaces of a street or alley are covered by this chapter and shall require a permit.
(Ord. 2010-5, passed 4-5-10)