(A) A tap charge shall be collected from each customer, prior to connection to the water system, in an amount sufficient to reimburse the city for the labor and materials necessary for tapping the main and installation of service from the main to the curb stop and the cost of furnishing and installing a suitable water meter.
(B) The following connection or tap-on fees shall be charged by the city waterworks system:
Connection or Tap-on | Fee |
5/8 inch - 3/4 inch
| $750.00
|
1 inch
| $1,000.00
|
Larger than 1 inch
| Actual cost of labor and material, but not less than $1,000.00
|
Water tap inspection
| $25.00
|
(Ord. 1977-3, passed 2-7-77; Am. Ord., passed 8-23-89; Am. Ord. 2002-21, passed 7-1-02; Am. Ord. 2005-12, passed 8-1-05; Am. Ord. 2007-06-11, passed 6-19-07; Am. Ord. 2010-2, passed 4-5-10; Am. Ord. 2013-14, passed 11-4-13; Am. Ord. 2019-11, passed 4-29-19; Am. Ord. 2021-23, passed 12-6-21; Am. Ord. 2022-15, passed 6-14-22)