A. Construction Debris Removal: Any building construction on sites shall provide debris removal sufficient to facilitate the regular cleanup and removal of construction debris from the site. Each site shall be cleaned and all construction debris removed on a weekly basis.
B. Utilities: All utilities shall be placed within public road rights of way or specific rights of way of easements free of legal encumbrances. Multiple use on given easements is encouraged. The final recorded plat shall note all easements. As a condition for single home or subdivision approval, the builder or subdivider shall install or cause to be installed the following improvements:
1. A water main in front of each parcel in size, location and with appropriate valves, etc., as approved by the city after review and recommendation of the planning commission.
2. Fire hydrants at intervals of not greater than five hundred feet (500') with each parcel not more than two hundred fifty feet (250') from the nearest hydrant. In the event it is necessary to extend a water main so that the same fronts each parcel or to access fire hydrants within two hundred fifty feet (250') of each parcel, then the cost of the water mains and hydrants shall be borne by the landowner who effectuates the subdivision of his/her property.
3. All trenches and disturbed areas under streets or proposed streets must be filled and compacted to the standards employed by the Utah department of transportation. (Ord. 2014-02, 4-8-2014)