10-15-3: PERMITS TO COMPLY:
From the time of the effective date hereof, permits shall not be granted for the construction or alteration of any building or structure, for the moving of a building or structure onto a lot, or for the change in use of any land, building or structure, if such construction, alteration, moving or change in use would be a violation of any of the provisions of this title, nor shall any sewer or water service line or electric utilities be installed to serve the premises if such use would be in violation of this title. (Ord. 6-18-81A, 6-18-1981)