(a) Street Standards.
(1) Street Design. Streets shall be dedicated to public use by the owner. Minor residential streets shall be so designed as to discourage their use by nonlocal traffic. Except where necessitated by local conditions, dead-end streets and cul-de-sacs will not be approved in residential districts. Dead- end alleys are prohibited in all districts. Easements for utilities must be provided alongside or rear lot lines where possible. Street rights of way shall have the following minimum widths:
i. Major arterial, which include Federal, State and County roads which are main arteries of access to the Village: one hundred feet (100'); an additional width of forty-five feet (45') shall be provided to accommodate a service drive wherever lots are to face a primary road;
ii. Minor arterial, which are next in importance as avenues of access between sections of the Village as opposed to commercial traffic and nonlocal traffic: eighty feet (80');
iii. Neighborhood collector, which are within a new subdivision: sixty feet (60');
iv. Minor residential, which are completely residential in nature: fifty feet (50');
v. Alleys: twenty feet (20');
vi. Easements: as required.
(2) Minimum Pavement Widths. Minimum pavement widths shall be as follows:
i. Major arterial: variable as conditions may require;
ii. Minor arterial: thirty-six feet (36');
iii. Neighborhood collector: thirty-two feet (32');
iv. Minor residential: twenty-six feet (26');
v. Alleys: eighteen feet (18');
vi. Service drives: twenty feet (20');
vii. Sidewalks: minimum four feet (4') along non-arterial and minimum width along arterial streets to be as approved by the Village Engineer.
(3) Maximum Grades. The maximum grades shall be:
i. Major arterial: four percent (4%);
ii. Minor arterial: five percent (5%);
iii. Neighborhood collector, minor residential streets and alleys: six percent (6%)
(4) Minimum Grade. The minimum grade for any street shall be one-half of one percent (0.5%) at the gutter, unless otherwise approved by the Village Engineer. Street intersections shall be rounded by radii not less than twenty feet (20') at the curbline.
(5) Standards. All street construction and specifications for materials shall be in conformity with standards required by the Village as published by the Village Engineer.
(6) Plans. The plans must bear the approval of the Village Engineer, Director of Public Service, Superintendent of Water/Wastewater, Superintendent of Streets, and Fire Chief. Places shall be provided for their signatures.
(b) Private Roadways.
(1) As used in this section "private roadway" means any passageway designed for use by motor powered vehicles, upon property owned by one or more persons, firms or corporations where such passageway serves in excess of four dwelling units.
(2) All proposed private roadways and their pavement widths shall be shown on the preliminary and final plats filed in accordance with these Subdivision Regulations. In addition, a document indicating the responsible party for maintenance shall also be provided.
(3) All private roadways shall be improved with a hard surface of concrete, asphalt or other similar products or combination of products. The construction and specification for materials for private roadways shall conform with standards provided by the Village standards as published by the Village Engineer.
(4) The minimum pavement width for private roadways shall be twenty-six feet (26') and the maximum grade shall be six percent (6%), however, the minimum grade for private roadways shall be one- half of one percent (0.5%) at the gutter, unless otherwise approved by the Village Engineer.
(5) Every private roadway ending in a dead end or at a cul-de-sac circle shall have a minimum pavement width as approved by the Planning Commission to assure access to the area for fire equipment and to facilitate the turning of vehicular traffic. In approving such minimum pavement widths, the Planning Commission shall consider whether such cul-de-sac or turn- around will be used for parking vehicles.
(6) The plans must bear the approval of the Village Engineer, Director of Public Service, Superintendent of Water/Wastewater, Superintendent of Streets, and Fire Chief. Places shall be provided for their signatures.
(c) Sanitary Sewers.
(1) Plans and profiles of sanitary sewers shall be submitted to the Director of Public Service. All grades, pipe sizes, manholes and other appurtenances shall be shown, and installation and materials shall be in conformity with Village standards as published by the Village Engineer.
(2) Sanitary sewer plans must bear the approval of the Director of Public Service and the Village Engineer and the Superintendent of Water/Wastewater. Places shall be provided for their signatures.
(d) Water Distribution.
(1) Plans of the proposed water distribution system shall be submitted to the Director of Public Service. All plans must show pipe sizes, locations of valves, fire hydrants and other appurtenances.
(2) Installation and materials shall be in conformity with Village standards as published by the Village Engineer.
(e) Storm Sewer Systems.
(1) Proposed storm sewers, including grades, pipe sizes, manholes, inlets and appurtenances may be shown on the street improvement plans. Installation and materials shall be in conformity with Village standards published by the Village Engineer.
(2) The owner or developer shall follow the recommendations of the Village Engineer with regard to the proper method and direction of drainage and storm water following review of the proposed plan of such drainage as submitted by the subdivider or his engineer. A storm water management report shall be submitted to the Village Engineer for review in conjunction with drainage plans.
(3) The storm sewer plans, if not incorporated as part of the street improvement plans, must bear the approval of the Village Engineer, Director of Public Service, Superintendent of Water/Wastewater, Superintendent of Streets, and Floodplain Administrator. Place shall be provided for their signature.
(f) Lots and Bocks.
(1) Every lot shall abut on a dedicated street. Double frontage lots shall be avoided. At the intersection of two streets, property line corners shall be rounded by an arc with a minimum radius of ten feet (10'). Size, shape and orientation of residential lots shall be appropriate to the location of the proposed subdivision and for the types of development contemplated and in conformity with the Zoning Code, with proper regard given yard areas, setback lines, etc. Excessive depth in relation to length shall be avoided. A proportion of two to one depth to frontage shall be normal and depths in excess of three (3) times the lot width are not recommended. Side lines of lots shall be approximately at right angles or radial to the street line. Corner lots shall have extra width sufficient to permit maintenance of building lines on both front and sides of lot. The maximum length of blocks may not exceed eighteen hundred feet (1,800') except where topographic conditions require longer blocks, nor shall they be less than four hundred feet (400') in length. Wherever blocks are longer than nine hundred feet (900'), crosswalks or crosswalk easements not less than ten feet (10') in width may be required near the center of the block, and Council may require that a sidewalk be constructed in accordance with Village standards for sidewalk construction. The width of a block shall normally be sufficient to allow two tiers of lots of appropriate depth except where double and reverse frontage lots are allowed. Where frontage on a primary street is involved, the long dimension of the block shall front thereon in order to minimize access intersections.
(2) Where either sanitary sewer or water service is not available, lots shall have a minimum frontage of seventy-five feet (75') and a minimum area of ten thousand (10,000) square feet . Where neither sanitary sewer nor water service is available, lots shall have a minimum frontage of one hundred (100) feet and a minimum area of twenty thousand (20,000) square feet.
(g) Drainage.
(1) The Planning Commission shall not approve any subdivision having inadequate storm drainage or other physical drainage impairment as determined by the Village Engineer. In areas known to be subject to periodic floods, such drainage improvements must be made as to satisfy the Director of Public Service and the Village Engineer in order that the health and welfare of the people will be protected.
(2) No natural drainage course shall be altered and no fill, buildings or structures shall be placed in it unless provisions are made for the flow of water in a manner satisfactory to the Village Engineer. An easement shall be provided on both sides of any existing important surface drainage course adequate for the purpose of protecting, widening, deepening, enclosing or otherwise improving such stream for drainage purposes.
(3) A master grade plan shall be prepared for all subdivisions and shall be presented to the for review and approval by the Village Engineer. The grading plan shall show the existing topography, the proposed street grades and the proposed storm sewers with pipe sizes and grades. It shall also show the proposed elevation at each lot corner, the proposed finish grades at the house and shall delineate the method of rear yard drainage by showing proposed swales and direction of surface slope by arrows. The grading plan shall follow the standards as established for such grading by the Village Engineer.
(4) Wherever possible, with exceptions being made where the topography of an area does not permit such grading practice, lots shall be graded from the rear lot line to the street. Where a lot abuts directly on two streets, the grade shall be from the corner of the lot which is diagonally opposite to the corner of the two streets on which the lot abuts. This section is included in order to reduce the amount of water standing in yards to a minimum. Therefore, where it is not possible to grade a lot in the prescribed manner, the owner or developer shall provide for the adequate drainage of any and all low areas and tie such drainage into and make it a part of the storm sewer system of the development and the Village as directed by the Village Engineer, with approval of such drainage subject to inspection by the Village Engineer along with the inspection of other storm sewer installations
(5) The Planning Commission shall not approve the final plat of any development or subdivision over which it has jurisdiction without certification from the Director of Public Service and the Village Engineer that such development or subdivision has been designed to be in full compliance with the design requirements contained in the Stormwater Management Policy and Design Manual.
(6) There is hereby adopted, and incorporated by reference as if set out at length herein, for the purpose of establishing rules and regulations for the design, construction, or alteration, the Stormwater Management Policy and Design Manual as hereafter amended in the most recent edition published by Village Engineer.
(h) Public Use Area.
(1) Ten percent (10%) of the area of each residential subdivision, exclusive of streets, shall be allocated for recreational uses. When a proposed subdivision contains an area described as a proposed public building site, park, playground or other public area, that area shall be dedicated on the plat to the Village, another public agency, or reserved for acquisition by the Village within a period of five (5) years by purchase or other means.
(2) Where required, the developer and the Village shall work out an arrangement for parks and recreational facilities.
(3) Proposed large scale neighborhood unit developments and similar unusual developments may require the reservation or dedication of such additional areas or sites of a character, extent and location suitable for the needs of the community facilities created by such particular developments where deemed necessary by the Planning Commission.
(4) Natural features of beauty such as trees, brooks, topography and views shall be preserved whenever possible in designing any subdivision.
(i) Underground and Electric Telephone Lines.
(1) The term "subdivision" as used in this section refers only to residential subdivisions of more than eleven (11) lots platted subsequent to December 18, 1967.
(2) Unless the subdivision has been exempted from the requirements of this section, as provided in subsection (e) hereof, all telephone and electric distribution wires, conduits, and cables therein shall be installed underground, except as necessary to bring service to the subdivision, and except for existing overhead facilities and any rearrangement, improvement or addition thereto.
(3) The preliminary plan with respect to the subdivision shall be submitted to the Village Engineer and to the electric and telephone utility companies which will provide service to the subdivision for their recommendations with respect to the width and location of easements for electric and telephone distribution cables and related facilities. The recommendations of the Village Engineer and such utility companies shall be submitted to the Planning Commission by the owner of the subdivision together with the plat of the subdivision. Prior to signing the plat of the subdivision, the Planning Commission shall determine that adequate easements are provided for all utility services, including underground electric and telephone distribution wires, conduits, cables, gas pipelines, sewer and water lines. The owner of the subdivision shall, at the time the plat of the subdivision is submitted for approval, present such evidence as the Planning Commission deems necessary to ensure that the owner shall makes or has made provision for all utility services, including underground electric and telephone distribution wires, conduits, cables, gas pipelines, sewer and water lines in accordance with this section, adequate for the anticipated needs of the subdivision.
(4) The construction of all underground facilities shall meet the minimum requirements of any code approved by the Public Utilities Commission of Ohio.
(5) If, in the opinion of the owner of any subdivision or a portion thereof, or any interested utility company, the installation of underground facilities is economically or physically unfeasible, such owner or utility company may apply to the Planning Commission for exemption of the subdivision or portion thereof from the requirements of this section, stating in the application for exemption the reasons thereof or, and submitting therewith such exhibits, documents and data as may be necessary to substantiate the request. The Planning Commission shall hold a hearing, at which the applicant and any other interested person may appear, at its regularly scheduled meeting, after the submission of an application for exemption. Notice of the hearing shall be given by certified mail by the applicant, at the applicant's expense, to each interested utility and owner no less than seven (7) days prior to such hearing. If the Planning Commission denies the application following the notice and hearing, the applicant may file a written appeal therefrom with the Clerk of Council, stating the reasons therefor, within thirty (30) days following the announcement of such decision by the Planning Commission. Such appeal shall be placed on the agenda for the next regularly scheduled meeting of Council following the filing thereof with the Clerk and shall be heard at such meeting. Council may, by resolution, reverse or affirm, wholly or in part, or may modify the decision of the Planning Commission.
(j) Separability. If any court of competent jurisdiction determines that any clause, section or portion of subsection (i) hereof is invalid or unconstitutional, such finding shall in no way affect the validity of unconstitutionality of the balance of subsection (i) hereof.
(k) Erosion and Sediment Control.
(1) An erosion and sediment control plan shall be prepared for all developments covered by this regulation which disturb one or more acres of land.
i. The erosion and sediment control plan shall conform to any and all standards defined in the Ohio Environmental Protection Agency authorization for storm water discharges associated with construction activity under the current National Pollutant Discharge Elimination System (NPDES) permit, and all revisions and amendments thereto. The Notice of Intent, as well as a copy of the Storm Water Pollution Prevent Plan (SWP3) shall be provided to the Village as part of the erosion and sediment control plan submittal.
ii. The SWP3 shall be prepared by a professional experienced in the design and implementation of erosion and sedimentation controls and shall address all phases of construction. The SWP3 shall incorporate, at a minimum, all of "Part III, Section G" SWP3 requirements of the current NPDES permit, and all revisions and amendments thereto.
(l) Utility and Traffic Studies. Utility and traffic studies may be required by the Village Engineer to facilitate proper master or large-scale planning of the Village's infrastructure prior to the submission of public or private construction plans. Fees for review of such traffic or utility studies shall be established and updated from time to time.
(Ord. 32-2020. Passed 1-19-21.)