Developers of proposed mobile home park(s) shall submit final plans for approval of the Township Board of Supervisors, together with an application fee as set from time to time by resolution of the Board of Supervisors. The plans shall be drawn in ink on 22 inch by 36 inch sheets of linen or Mylar and shall be drawn to scale showing the location of the boundary lines of the proposed mobile home park, all lot lines, the location, profiles and construction of all streets, curbs and sidewalks, the location of all utility lines and easements, and the location of all sanitary sewer lines and disposal systems. The plans shall be submitted to the Township Administrative Secretary/Treasurer in six copies, and they will be considered by the Board of Supervisors of the township, and reviewed by and commented on by the Township Engineer and the Township Solicitor within 45 days from the date of receipt. The Board of Supervisors shall render its decision and communicate the same to the applicant(s) not later than 90 days after receipt of the final plans and the application. If the final plans are approved, a permit will be issued by the Township Administrative Secretary/Treasurer upon the posting of a performance bond by the applicant, as and if required by the Board of Supervisors. Mobile home parks previously approved or in existence upon the effective date of this subchapter, shall be required to meet only the standards of the Pennsylvania Department of Environmental Protection and all other minimum standards prescribed herein shall be applicable only to those parks which are constructed, altered or expanded after the effective date hereof.
(2003 Code, § 146-61) (Ord. 2-96, passed 7-5-1996)