1478.08  REVIEW AND APPROVAL OF PLANS.
   No person or entity shall construct a wireless telecommunications tower and facility, or place a wireless telecommunications antenna, on any legal tower, building or structure, without a site plan review; (a public hearing and approval by the Planning and Zoning Commission), as specified below:
   (a)   The site plan for the construction of a wireless telecommunications tower and related facility shall be reviewed and approved according to the standards and procedures set forth in Sections 1262.06 and 1262.07 of the Planning and Zoning Code.
   (b)   The placing of a wireless telecommunications antenna on any legal tower, building or structure (which may or may not involve co-location with another wireless service provider) shall be reviewed and approved according to the standards and procedures set forth in Section 1262.06 of the Planning and Zoning Code, and the site plan shall consist of a drawing or depiction which accurately conveys the following information:
      (1)   A vicinity map indicating the location of the site and the existing structure;
      (2)   The location of the antenna on the structure;
      (3)   The length of any projection above the existing structure (if applicable); and
      (4)   The location of the equipment shelter.  If the equipment shelter is separate from the structure, its size, fencing, landscaping, setbacks and evidence of legal access to the site shall be indicated.
         All other applicable site plan review procedures, as set forth in Section 1262.07 of the Planning and Zoning Code shall also be adhered to.
(Ord. 98-6.  Passed 4-28-98.)